Malaysia
-
Despite a short 18-month planning time and very limited geological data, the TTD-1 high-pressure/high-temperature (HP/HT) exploration well in East Malaysia’s Block SK was drilled successfully.
-
As a field matures, there is a crucial need to focus on integrity-related issues such as hazard prevention and mitigation.
-
This paper shares the engineering approach used to determine where and when sand control was needed in offshore Malaysia on the basis of geomechanical sand-free critical-drawdown-pressure evaluation for the selected well type, configuration, and completion.
-
Integration of technology applications is paramount in increasing the success rate of data delivery.
-
The K field is one of the more developed deepwater fields currently going through development in Malaysia.
Page 9 of 9