Drilling
The company said that its AD-300, a 50-m-high automated island drilling rig that walks between wells, was delivered 3 months ahead of schedule.
A report commissioned by Havtil, the Norwegian Ocean Industry Authority, calls for better dialogue regarding pore-pressure uncertainty and higher-end drilling techniques like managed pressure drilling as methods to reduce the risk of well-control events.
This paper presents a study that confirms glass-reinforced-epoxy-lined tubing as a reliable, cost-effective solution for long-term water-injection service in moderate-salinity offshore environments.
-
Drilling, completion, production, and general surveillance are all areas that benefit greatly from remote real-time analysis. However, several challenges to remote services exist, including communications issues, fear of job loss, and working outside one’s comfort zone. What is considered an important development goal for a business might be regarded as a threat to an…
-
Recently, while preparing to present a seminar on deepwater-well-construction optimization, I tried hard to find a word or a phrase that could be seen as “the secret” for a safe and optimized drilling performance.
-
Data-mining processes are fundamental in obtaining the predictive benefits of real-time systems and have been progressing from descriptive to predictive optimization methods.
-
During the optimization process, the Castilla field became the model of management strategies for the rest of the fields in the company portfolio.
-
Integration of technology applications is paramount in increasing the success rate of data delivery.
-
-
The general industry perception is that, when drillstrings or casing strings exceed conventional helical-buckling criteria, they cannot be operated safely in the hole because the risk of failure or lockup is too high.
-
ExxonMobil, operator for the Sakhalin-1 project, planned an additional drilling campaign at the Chayvo field, Sakhalin Island, Russia.
-
In 2012, the number of unconventional tight gas/shale and high-pressure/high-temperature (HP/HT) papers continued to grow. This year, we had some very interesting developments in these and other areas of well construction.
-
This case history presents the highly challenging extended-reach deepwater well, Ursa A-10, drilled in the Ursa (Latin for bear) prospect in the US Gulf of Mexico (GOM).