Inspection/maintenance
Sponsored
As HPHT wells push equipment to the edge of material limits, operators are turning to advanced thermoplastics and sealed electrical assemblies to maintain system integrity. From ESP insulation to BOP control systems, the right component design can prevent failures, lower intervention costs, and extend equipment life in the harshest offshore environments.
This paper presents an approach to management and interpretation of pipeline-integrity data, ensuring integrity, safety, and reliability of the operator’s critical pipelines.
This paper describes the development of a system for comprehensive mapping and asset registration using a digital-twin approach.
-
An autonomous robot will be deployed on an offshore platform for the first time by Equinor. The operator plans to use it as its eyes and sensors on future platforms where humans will visit only intermittently.
-
The paper describes the steps that have already been taken to create an industry-wide group that includes operators, class regulators, and service providers to agree on the primary challenges and to encourage development of practical solutions in a cost-efficient way.
-
On the normally unmanned Valhall Flank West platform, the survey of a 1-year-old box boom pedestal crane featured auto-testing of the automatic overload protection system. A similar inspection program was performed on two knuckle boom cranes on a FPSO vessel in Skarv.
-
Monitoring of corrosion in process pipelines has always been of paramount importance in ensuring plant-asset integrity. Similarly, steam traps play an important role in ensuring steam quality and, thus, the integrity of critical assets in the plant.
-
The service company says its engageSubsea Remote platform provides real-time equipment-status information.
-
The Abu Dhabi National Oil Company announced that it has completed the first phase of its large-scale multiyear predictive maintenance project, which aims to maximize asset efficiency and integrity across its upstream and downstream operations.
-
Phase 1 covers the modeling and monitoring of assets for six ADNOC Group companies. The four phases of the project are expected to be completed by 2022.
-
The data have been collected and analyzed from more than 18,000 equipment units with failure and maintenance records and includes information on subsea fields with more than 2,000 years of operating experience.
-
Akers BP said it will use lessons learned from the pilot and scale the remote-assist concept across its assets.
-
To provide condition monitoring and combat fouling, the robot clings and moves along the hull walls. It is controlled via a 4G connection to clean and inspect the walls in line with individual vessel schedules developed through a proprietary algorithm and big data.