Onshore/Offshore Facilities
War‑related infrastructure damage is beginning to influence global energy supply chains in ways that could reshape project development and capacity growth.
Sulzer and JSIL are teaming up to provide the service for oil and gas, power generation, and industrial operations.
The deal includes Waygate’s inspection portfolios and is expected to close later this year.
-
A program was devised to test the manufacturability of shrink-fit joints made from high-strength (greater than 100 ksi) mill pipe and forged couplings.
-
Gas production in the South China Sea has seen an increasing trend of pipelines operating in high-pressure, high-temperature (HP/HT) conditions. This has led operators to look beyond the conventional stress-based design and move into strain-based design using the lateral-buckling-design approach. This paper presents both construction challenges and operational works p…
-
Many two-phase and three-phase separators in the oil and gas industry continue to underperform. This article explores the weaknesses in different sizing methodologies and proposes manageable approaches to quantifying each.
-
In an SPE webinar, “Foaming in Separators: Handling and Operation,” Wally Georgie, principal consultant at Maxoil Solutions, presented an overview of foam generation and how the design of processes and chemical management can exacerbate its detrimental effects in separators.
-
The effects of turbulence/shear and thermal driving force on wax-deposition characteristics were experimentally studied using a waxy crude oil from the Gulf of Mexico.
-
As natural gas pipeline systems have grown larger and more complex, the importance of optimization of design and operation of pipelines has increased. This paper examines the optimization issue for the Egyptian gas transmission pipeline network.
-
Field trials were conducted by BP on the commercial version of wired pipe with a comprehensive suite of logging-while-drilling (LWD) tools, measurement-while-drilling (MWD) functionality, and rotary-steerable- capability on two Wyoming wells in 2007.
-
Solid-expandable tubular (SET) is widely used to patch casing and has proved to be cost effective.
-
The general industry perception is that, when drillstrings or casing strings exceed conventional helical-buckling criteria, they cannot be operated safely in the hole because the risk of failure or lockup is too high.
-
Compared to the US industrial average downtime ranging from 3% to 5%, the oil and gas industry’s estimated downtime ranges from 5% to 10%,indicating that improvement is needed in reliability and maintenance of facilities, equipment, and processes.