Drilling
The agreement focuses on improving operational efficiency and consistency through advanced digital tools and real-time data integration.
An innovative approach uses a random-forest-based framework to link logging-while-drilling and multifrequencey seismic data to enable dynamic updates to lithology parameter predictions, enhancing efficiency and robustness of geosteering applications.
Oil and gas companies drilled 75 “high-impact” wells in 2024, representing 5.2 billion BOE.
-
The variables defining drill-bit performance cover a lot of ground. There is a lot of attention given to cutters studding diamond drill bits, but just as important are what is in the rest of the drillstring and the decisions made by the driller.
-
A previous attempt to drill an exploration well in ultradeep water in the Gulf of Mexico (GOM) did not reach its objective.
-
The vision of fully automated drilling rigs driven by big data gathered in real time looks so far off but there are people working on a road map to help the oil and gas industry find its way there some day.
-
This paper describes the design, testing, installation, and performance of the first fully completed well using an intelligent inner completion inside an uncemented liner with openhole packers for zonal isolation.
-
This paper describes placement of horizontal wells in this kind of heterogeneous reservoir through an integrated approach.
-
The oil industry has always been innovative, even under adverse and challenging conditions imposed by the nature of upstream projects.
-
This paper presents a case history of a North Sea well in which managed-pressure drilling (MPD) was used as the enabling technology to drill, case, and cement the well.
-
This paper discusses the factors to be taken into account when designing cement jobs using fluids in turbulent flow and some of the overlooked benefits of using turbulent-flow design for mud removal.
-
This paper describes the first application of the 10¾-in. CV in a deep-well sour environment.
-
The most common method used for the placement of cement plugs is the balanced-plug method using drillpipe, tubing, or a combination of both.